Cuplock Standard
code | name | length | Surface Treatment | Materil | band | standard |
UTM-CL-163-500 | Cuplock Standard | 500mm | galvanized | Q355 | UTM | BS1139 |
UTM-CL-163-1000 | 1000mm | |||||
UTM-CL-163-1500 | 1500mm | |||||
UTM-CL-163-2000 | 2000mm | |||||
UTM-CL-163-2500 | 2500mm | |||||
UTM-CL-163-3000 | 3000mm |
Scaffold Cuplock Standards are manufactured by a fixed bottom cup which is welded at 50mm intervals, with a capative moving top cup that can secure up to four components.
The cuplock standard provides vertical support for the entire scaffold cuplock system.
Cuplock Standard
code | name | length | Surface Treatment | Materil | band | standard |
UTM-CL-163-500 | Cuplock Standard | 500mm | galvanized | Q355 | UTM | BS1139 |
UTM-CL-163-1000 | 1000mm | |||||
UTM-CL-163-1500 | 1500mm | |||||
UTM-CL-163-2000 | 2000mm | |||||
UTM-CL-163-2500 | 2500mm | |||||
UTM-CL-163-3000 | 3000mm |
Scaffold Cuplock Standards are manufactured by a fixed bottom cup which is welded at 50mm intervals, with a capative moving top cup that can secure up to four components.
The cuplock standard provides vertical support for the entire scaffold cuplock system.