1m— 2m Ringlock Scaffolding Intermediate Transom

Materil:Q235
Finsh:Hot Dip Galvanized
Standard:EN74/BS1139/AS1576
 
  • Ringlock Intermidiate Transom

  • UTM

  • UTM-RLS-151

length:
Availability:
Quantity:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Ringlock Intermidiate Transom

code name length Surface Treatment weight/kg Materil band standard
UTM-RLS-151-730 Ringlock Intermidiate Transom 730mm galvanized 4.07 Q235 UTM EN74/BS1139/AS1576
UTM-RLS-151-1040 1040mm 5.15
UTM-RLS-151-1090 1090mm 5.41
UTM-RLS-151-1570 1570mm 7.17
UTM-RLS-151-2070 2070mm 8.84

Scaffolding ringlock Inter-transom are designed to create a transom at the deck level anywhere inside of the bay by stradding the outer ledgers/transoms of the bay.

Mid Transom




Previous: 
Next: 

ABOUT COMPANY

Nanjing Uni-tech Metalwork Company Ltd is an enterprise specializing in the production and trade of scaffolding and formwork accessories,
Copyright ©️ 2022 Nanjing Uni-tech Metalwork Company Ltd. Support by Leadong. Sitemap.                                                           苏ICP备2024058162号​​​​​​​